This webpage is kept for archival purposes only and is no longer updated or maintained.
Image and Description |
Submitted By |
Date |
ACD in Thermal Vacuum Test Chamber |
D. Thompson |
July 22, 2005 |
ACD Being Installed on its Thermal Vacuum Fixture |
Tom Johnson |
July 20, 2005 |
ACD Vibration Test Video
|
D. Thompson |
July 20, 2005 |
The ACD Assembly Sequence |
D. Thompson |
July 18, 2005 |
The ACD and the MicroMeteoroid Shield |
D. Thompson |
July 15, 2005 |
The Full ACD |
D. Thompson |
June 9, 2005 |
Qualification Electronics Chassis |
D. Thompson |
Aug 4, 2004 |
GLAST Emblem Plaque |
D. Thompson |
July 21, 2004 |
ACD Electronics Chassis |
D. Thompson |
July 14, 2004 |
ACD Mechanical Structure |
D. Thompson |
July 14, 2004 |
Base Frame Assembly |
D. Thompson |
March 22, 2004 |
ACD Tile Shell Assembly Status - March 19 |
D. Thompson |
March 19, 2004 |
Photomultiplier Tube Assembly Facility |
D. Thompson |
October 16, 2003 |
The ACD Team Members |
D. Thompson |
September 25, 2003 |
Engineering Model Electronics Chassis - used for fit checking of phototubes, high voltage bias supplies, and FREE cards. |
D. Thompson |
July 9, 2003 |
ACD Scintillating Fiber Ribbons - Assembly of an ACD scintillating fiber ribbon and bending fixture for ACD scintillating fiber ribbons. |
D. Thompson |
Apr 25, 2003 |
FREE Card - ACD Front End Electronics (FREE) Card - Development Unit |
D. Thompson |
Jan 14, 2003 |
Thermal Vacuum Test Set Up - Thermal Vacuum test set up for three Tile Detector Assemblies (TDA's) along with four PMT/Resistor Network assemblies. Note that two of the three TDA's are mounted to a flight like mechanical structure. |
Tom Johnson |
Dec 2, 2002 |
Z-axis Vibration Test Set Up - This is a picture of the Z-axis vibration test set up for the 4 PMT/Resistor Network (RN) assemblies. Three Tile Detector Assemblies (TDA's) are attached to the 4 PMT/RN assemblies via clear fiber cables. |
Tom Johnson |
Dec 2, 2002 |
Hypervelocity Test - Micrometeoroid Shield Test - Preliminary Photos. These snapshots were taken during testing at Rice University on October 7-8, 2002 |
D. Thompson |
Oct 15, 2002 |
ACD Fiber Routing Mock-up Details |
D. Thompson |
Mar 27, 2002 |
ACD Fiber Routing Mock-up |
D. Thompson |
Mar 27, 2002 |
ACD Prototype Tile Assembly |
D. Thompson |
Mar 6, 2002 |
ACD Support Shell |
D. Thompson |
Mar 6, 2002 |
ACD Tower - ACD Tower with all tiles attached. |
D. Thompson |
Feb. 14, 2000 |
Curved Tile - Curved tile for the top of the tower. |
D. Thompson |
Feb. 14, 2000 |
ACD Tower - ACD Tower for the Beam Test |
D. Thompson |
Nov. 18, 1999 |
ACD Stack - ACD Beam Test Stack |
D. Thompson |
Nov. 18, 1999 |
ACD Electronics Board - ACD Beam Test electronics board. |
D. Thompson |
Nov. 18, 1999 |
Testing the ACD Electronics - Testing of the ACD electronics for the 1999 SLAC Beam Test |
Jeff Silvis |
Oct. 11, 1999 |
ACD Electronics Board - One of six ACD electronics boards. |
Jeff Silvis |
Oct. 11, 1999 |
Beam Test Scintillator - Scintillator tiles for beam test with waveshifting fibers (two configurations). |
D. Thompson |
July 13, 1999 |
Beam Test Tile - Scintillator tile for beam test ACD. |
D. Thompson |
July 6, 1999 |
Beam Test Frame - Structural frame for beam test ACD. |
D. Thompson |
July 6, 1999 |