| Image and Description | Submitted By | Date |
|---|---|---|
| ACD in Thermal Vacuum Test Chamber | D. Thompson | July 22, 2005 |
| ACD Being Installed on its Thermal Vacuum Fixture | Tom Johnson | July 20, 2005 |
ACD Vibration Test Video
|
D. Thompson | July 20, 2005 |
| The ACD Assembly Sequence | D. Thompson | July 18, 2005 |
| The ACD and the MicroMeteoroid Shield | D. Thompson | July 15, 2005 |
| The Full ACD | D. Thompson | June 9, 2005 |
| Qualification Electronics Chassis | D. Thompson | Aug 4, 2004 |
| GLAST Emblem Plaque | D. Thompson | July 21, 2004 |
| ACD Electronics Chassis | D. Thompson | July 14, 2004 |
| ACD Mechanical Structure | D. Thompson | July 14, 2004 |
| Base Frame Assembly | D. Thompson | March 22, 2004 |
| ACD Tile Shell Assembly Status - March 19 | D. Thompson | March 19, 2004 |
| Photomultiplier Tube Assembly Facility | D. Thompson | October 16, 2003 |
| The ACD Team Members | D. Thompson | September 25, 2003 |
| Engineering Model Electronics Chassis - used for fit checking of phototubes, high voltage bias supplies, and FREE cards. | D. Thompson | July 9, 2003 |
| ACD Scintillating Fiber Ribbons - Assembly of an ACD scintillating fiber ribbon and bending fixture for ACD scintillating fiber ribbons. | D. Thompson | Apr 25, 2003 |
| FREE Card - ACD Front End Electronics (FREE) Card - Development Unit | D. Thompson | Jan 14, 2003 |
| Thermal Vacuum Test Set Up - Thermal Vacuum test set up for three Tile Detector Assemblies (TDA's) along with four PMT/Resistor Network assemblies. Note that two of the three TDA's are mounted to a flight like mechanical structure. | Tom Johnson | Dec 2, 2002 |
| Z-axis Vibration Test Set Up - This is a picture of the Z-axis vibration test set up for the 4 PMT/Resistor Network (RN) assemblies. Three Tile Detector Assemblies (TDA's) are attached to the 4 PMT/RN assemblies via clear fiber cables. | Tom Johnson | Dec 2, 2002 |
| Hypervelocity Test - Micrometeoroid Shield Test - Preliminary Photos. These snapshots were taken during testing at Rice University on October 7-8, 2002 | D. Thompson | Oct 15, 2002 |
| ACD Fiber Routing Mock-up Details | D. Thompson | Mar 27, 2002 |
| ACD Fiber Routing Mock-up | D. Thompson | Mar 27, 2002 |
| ACD Prototype Tile Assembly | D. Thompson | Mar 6, 2002 |
| ACD Support Shell | D. Thompson | Mar 6, 2002 |
| ACD Tower - ACD Tower with all tiles attached. | D. Thompson | Feb. 14, 2000 |
| Curved Tile - Curved tile for the top of the tower. | D. Thompson | Feb. 14, 2000 |
| ACD Tower - ACD Tower for the Beam Test | D. Thompson | Nov. 18, 1999 |
| ACD Stack - ACD Beam Test Stack | D. Thompson | Nov. 18, 1999 |
| ACD Electronics Board - ACD Beam Test electronics board. | D. Thompson | Nov. 18, 1999 |
| Testing the ACD Electronics - Testing of the ACD electronics for the 1999 SLAC Beam Test | Jeff Silvis | Oct. 11, 1999 |
| ACD Electronics Board - One of six ACD electronics boards. | Jeff Silvis | Oct. 11, 1999 |
| Beam Test Scintillator - Scintillator tiles for beam test with waveshifting fibers (two configurations). | D. Thompson | July 13, 1999 |
| Beam Test Tile - Scintillator tile for beam test ACD. | D. Thompson | July 6, 1999 |
| Beam Test Frame - Structural frame for beam test ACD. | D. Thompson | July 6, 1999 |